Process Control Strategy Review and Update
Ethylene Pipeline Control Strategy
Safeguarding Defence Documentation
Ethylene Let-down station Relocation
Technical Audit for Customer/ supplier reconciliation
Technical Participation of the European Ethylene User Group evaluating Coriolis Measurement as alternative New Technology.
E&I Project Management
E&I Maintenance Management
Technical Training on Products and Rolls
Assessment/ suitability of Pipeline Leak detections systems
ATEX Survey, Inspection, Report and Defects lists on Projects with 3000, 9000 and 1100 assets
ATEX Intrinsically Safe Circuit Associated documentation re ELD compatibility
Hazardous Process Area Fire and Gas Study
Replacement of Obsolete 9 Mass Flow Computers.
PLC Upgrade which included the reverser engineering of pump line-up sequences.
DCS Replacement
Investigation into Shipping loading berth metering Errors
Provision of Hazardous Area databases for setting up Inspection model
Functional safety SIL gap analysis
Management of , and mentoring of maintenance support staff
Fire Risk Assessment and First Managers reporting